• About Us
  • Advertise
  • Contact Us
  • Privacy Policy
Friday, February 27, 2026
NewsOnline Nigeria
  • Headlines
  • Top Stories
  • Politics
  • Crime Watch
  • Entertainment
  • Sports
No Result
View All Result
  • Headlines
  • Top Stories
  • Politics
  • Crime Watch
  • Entertainment
  • Sports
No Result
View All Result
NewsOnline Nigeria
No Result
View All Result
  • Headlines
  • Top Stories
  • Politics
  • Crime Watch
  • Entertainment
  • Sports
ADVERTISEMENT
ADVERTISEMENT
Home Top Stories

FG Gives Timeline To Actualize 6500 Megawatts Power Generation

, “4000 megawatts is not acceptable and we have plans to increase the megawatts to a minimum of 6000 to 6500 within the next three to six months.” 

by NewsOnline Nigeria
March 12, 2024
in Top Stories
0
FG

FG has given a timeline to actualize 6500 Megawatts of Power Generation.

 

NewsOnline Nigeria reports that the Federal Government (FG) has disclosed plans to increase the country’s power generation from around 4000 megawatts to 6500 megawatts in the next five to six months.

 

This Nigeria news platform understands that the Minister of Power, Adebayo Adelabu disclosed this while meeting with Agency heads and stakeholders in the Nigeria Power industry.  

 

ALSO: Governor Abba Kabir-Yusuf Urges Tinubu To Reopen Land Borders

 

According to him, the current 4000 megawatts of power generation is not acceptable and there is infrastructure in place to increase it significantly.  

 

He stated, “4000 megawatts is not acceptable and we have plans to increase the megawatts to a minimum of 6000 to 6500 within the next three to six months.” 

 

“What we are looking at is to have an agreement to ramp up to a minimum of 6000 megawatts within the next three to six months.” 

 

“I know that the highest we ever generated was 5,700 megawatts about three years ago, that was specifically in Nov. 2021.” 

 

“And these 5700 megawatts were also distributed. If we could achieve 5,700 at that time, I believe we still have the infrastructure to generate between 6,000 and 6,500,” 

Low gas supply 

He attributed the low power generation to gas supply issues noting that from the power generation companies he had visited, the capacity to do 6000 MW is present. 

He said,

“Once there is gas supply, we want to ramp up generation to a minimum of 6,000 megawatts,” 

The minister stated that the Ministry of Power and its subordinate agencies are working around the clock to rectify the situation swiftly.

 

He emphasized their commitment to not resting until stable electricity is attained, noting that the convened meeting aimed to tackle the problems within the power sector.  

 

Adelabu highlighted President Bola Tinubu’s administration’s dedication to identifying and resolving the underlying issues to ensure a reliable electricity supply for consumers.

Previous Post

Governor Abba Kabir-Yusuf Urges Tinubu To Reopen Land Borders

Next Post

President Tinubu Commences Probe Of CBN’s N30tr Overdraft Under Buhari

Next Post
President Tinubu

President Tinubu Commences Probe Of CBN’s N30tr Overdraft Under Buhari

Trending Stories

No Content Available

Latest Stories

FCCPC

FCCPC Uncovers Alleged Price Manipulation by Nigerian Airlines During December 2025 Festive Season

Adamawa Governor Ahmadu Fintiri

BREAKING: Adamawa Governor Ahmadu Fintiri Officially Joins APC

N2.1tn NNPC Deductions

Tinubu’s Executive Order Halts N2.1tn NNPC Deductions, Sparks Oil Sector Debate

Simi

Lagos DSV Agency Refers Old Tweets Linked to Simi to Police for Investigation

Tinubu

Tinubu Approves Reconstruction of Niger Roads, Extends Bodo–Bonny Road to East–West Highway

Electoral Act 2026

Atiku, Obi, Amaechi, Others Reject Amended Electoral Act 2026, Accuse APC of 2027 Election Strategy

Electoral Frauds

Between Electoral Frauds and Flourishing Democracy By Gabriel Akinlade-Daniel

Peter Obi

Peter Obi Says ‘Lawlessness Not New to Me’ After Failed Edo Assasination Attempt

ADC

ADC Condemns Peter Obi’s Edo Assasination Attempt, Accuses APC of Political Intimidation

Tunji Disu

Tinubu Decorates Tunji Disu as Acting IGP at State House, 48 Days to Retirement

NewsOnline Nigeria

Get the Latest Naija News, Breaking News, Top Stories, World News, Business, Politics & Entertainment from NewsOnline Nigeria.

RELEVANT PAGES

  • About Us
  • Advertise
  • Contact Us
  • Privacy Policy

ALERT US

Important Press Releases, Special Investigations: [email protected]

OFFICE ADDRESS

13 Poland Street, London, United Kingdom (UK)

Copyright © 2026 NewsOnline Nigeria

No Result
View All Result
  • Headlines
  • Top Stories
  • Politics
  • Crime Watch
  • Entertainment
  • Sports

Copyright © 2023 Newsonline Nigeria