Categories: Economy And Business Headline

BREAKING: FG Approves N6bn For Third Mainland Bridge Maintenance

The announcement comes barely two weeks after the Lagos State Government said it would undertake rehabilitation works on the 32-year-old Bridge to repair failed and peeled asphaltic sections and substructure.

FG has approved N6bn for Third Mainland Bridge Maintenance.

 

NewsOnline reports that the Federal Government, on Wednesday, approved N6.28bn for surface maintenance of the Third Mainland Bridge, Lagos State.

 

The Minister of Works and Housing, Babatunde Fashola, who briefed State House correspondents after this week’s Federal Executive Council meeting at the Presidential Villa said the 24-month repair will cover 11 kilometers including interchanges, ramps, and critical links.

 

 

ALSO: Peter Obi: Lai Mohammed Reacts Call For His Arrest, Prosecution

 

He said the move aligns with Executive Order 11 signed by the President, Major General Muhammadu Buhari (retd.), in April 2022, which gave legal backing to the country’s national maintenance policy.

 

The announcement comes barely two weeks after the Lagos State Government said it would undertake rehabilitation works on the 32-year-old Bridge to repair failed and peeled asphaltic sections and substructure.

 

However, Fashola argued that there will be no duplication of efforts.

The former Lagos State governor said the State’s Public Works Corporation will focus on the functional structure of the bridge such as the underwater piles, while the FG will undertake surface maintenance to treat potholes and restore missing guard rails.

He said “Council approved a fresh contract for the maintenance of the pavement of the third mainland bridge and this was approved in the sum of N6.28bn for a period of 24 months.

 

“I have been asked about the works that have been done on the bridge before. The works are concentrating largely on the substructure of the bridge; the underwater piles, the pile caps and also the replacement of the expansion joints and the bearings.

 

“These are maintenance works that are critical to the structural integrity of the bridge. What we’re dealing with now is different. It is the driving surface and also the aesthetics. Some of the rails have been stolen. Some of the pleats are misaligned at the routes that lead you on and off the bridge.”

 

Fashola added that there are no anticipated prolonged closures during the works.

 

Meanwhile, the council also approved N17.5bn variation for the contract for the construction of the old Enugu-Onitsha road whose current sum now stands at N48.99bn.

NewsOnline Nigeria

Recent Posts

  • 2027 Election
  • Headline

BREAKING: NJC Recommends 12 Judges for Court of Appeal Ahead of 2027 Election Cases

NJC has recommended 12 Judges for Court of Appeal ahead of 2027 election cases.  …

2 hours ago
  • Crime Watch
  • Top Stories

EFCC Under Fire Over Hospital Evasion, Doctors Brutality In Uyo

EFCC has come under fire over hospital evasion and doctor brutality in Uyo.   NewsOnline…

2 days ago
  • Politics
  • Top Stories

Embattled APC Rivers Governor, Sim Fubara Breaks Silence On Alleged Defection To NDC (VIDEO)

Embattled APC Rivers Governor, Sim Fubara has broken silence on his alleged defection to NDC.…

2 days ago
  • Crime Watch
  • Headline

BREAKING: EFCC Arrests Energy Commission DG Mustapha Abdullahi Over N500bn Money Laundering

EFCC has arrested Energy Commission DG Mustapha Abdullahi over alleged N500bn money laundering.   NewsOnline…

2 days ago
  • Politics
  • Top Stories

Lagos Assembly Speaker Obasa Declares for Agege Reps Seat

Lagos Assembly Speaker Obasa has declared for Agege Reps seat.   NewsOnline Nigeria reports that…

2 days ago
  • Africa
  • Economy And Business
  • Top Stories

Tinubu Demands Global Financial Reforms, Says Africa’s Growth Is Being Stifled

President Tinubu has demanded global financial reforms and claimed that Africa’s growth is being stifled.…

2 days ago